Sacred mosque expansion project with HVAC duct systems coordination. Developed mechanical equipment LOD and managed clashes using Navisworks.
- LOD
- 400
- Type
- Religious
- Location
- Makkah, KSA

Key deliverables
- Reviewed HVAC design drawings and the last updated Revit model
- Remodeled missing parts and developed all mechanical equipment LOD so that it matches the last updated material submittals
- Coordinated HVAC - Duct systems with other disciplines and managed the clashes using Navisworks, assuring zero clash model
- Prepared shop drawing submittals of the coordinated HVAC systems layouts
Scope of work
- Design Check
- 3D Modelling
- MEP Coordination
- Shop Drawing
Trades
- HVAC - Duct Systems
- Air Conditioning