Third Saudi Expansion of Holy Haram: Zone 13 & 14, Third Floor

Sacred mosque expansion project with HVAC duct systems coordination. Developed mechanical equipment LOD and managed clashes using Navisworks.

LOD
400
Type
Religious
Location
Makkah, KSA
Third Saudi Expansion of Holy Haram: Zone 13 & 14, Third Floor, Makkah, KSA

Key deliverables

  • Reviewed HVAC design drawings and the last updated Revit model
  • Remodeled missing parts and developed all mechanical equipment LOD so that it matches the last updated material submittals
  • Coordinated HVAC - Duct systems with other disciplines and managed the clashes using Navisworks, assuring zero clash model
  • Prepared shop drawing submittals of the coordinated HVAC systems layouts

Scope of work

  • Design Check
  • 3D Modelling
  • MEP Coordination
  • Shop Drawing

Trades

  • HVAC - Duct Systems
  • Air Conditioning
  • Ventilation
Discuss a similar project